Laserfiche WebLink
~_ _ _ <br />~~. IIIIIIIIIIIIIIIIIII Pemit :In. BD_47,UG <br />999 itI\'ED LtiVD RECL.tiLyTION B0~ <br />Department of Natural Resources <br />1313 Sherman Street, Room 723 Telephone: 839-3567 <br />Denver, Colorado 80203 <br />DEVELOPMENT AND EYTRACTION >tINING PSIL*1IT <br />THiS PER.~fIT is issued this 13th day of June, 1980 by the Mined Land <br />Reclamation Board, Department of Natural Resources, State of Colorado. <br />W I T :J E S S E T H <br />WfiEREaS, The Atlantic Richfield Company desires to conduct a(n) Underground mining <br />operation, known as Colony Development Operation:or the purpose of extracting underground <br />mined oil shale. <br />[JHc'REAS, on March 11, 19 80, The Atlantic Richfield Company "FILID" an <br />application,a reclamation plan and map, and the required fee, as required by law; and <br />~N~IEREAS, on play 29 , 19 gp , the :tined Land Reclamation Board approved <br />The Atlantic Richfield Company application and set bond; and <br />wdEREAS, on June 13 , 19gp the :fined Land Reclamation Board accepted <br />surety submitted bq The Atlantic Richfield Company and such date shall be censidezed the <br />date of issuance of the permit and the anniversary date for all other purposes; and <br />[,'dERE_~S, the Mined Land Reclamation Board has made a finding, for the purposes <br />of issuing this permit, that: <br />1) the application comnlias with the requirements of the Colorado <br />wined Land Reclamation act and all applicable local, state and <br />Federal laws; and, <br />2) the operation will not adversely affect the stability of any <br />significant, valuable, and permanent man-made structures located <br />within tcro hundred feet of the affected land, except where there <br />is an agreement between the operator and the persons having an <br />interest in the structure that damage to the structure is to be <br />compensated for by the operator; and, <br />3) the proposed mining operations and reclamation can be carried out <br />in confo*_mance with the requirements of C.R.S. 19i3, 34-32-116, as <br />amended (1916 Sess. Laws H.B. 1060 ; and <br />'JH~REAS, far the purposes of issuing this ?ermit, the operator has made a <br />satisfactory showing to the Board that he will employ during and after his <br />access road and mine bench operations orecedures reasonably desi_sned to minimize <br />as =uch as practicable the disruptien from the operations <br />ar_d rill provide for the rehabilitation of the affected land through the rehabilitaticn <br />c_° ?'_anc cover, soil stability, water resources, and other measures appropriate t~ the <br />subseeuent beneficial use of such mined and reclaimed lands; and that in the event <br />of _-_ =allure of his proposed reclamation plan, he will ta1:e crhatever measures -..._,... <br />may '~e accessary in order to assure the success of reclamation of the lands af_ecced <br />by h_s operations; and, <br />'.•~'HEREaS, for the purposes of issuing this permit, a copy of the application <br />apnreved by the ?lined Land Reclamatior. Board of the State of Colorado is attac'.^.ed <br />to this permit and thereby becomes a part of the Germs hereof. <br />`:0'.r, T'dEREFORE, pursuant to the authority set forth in the Colorado `fined <br />Laced Reclamation act, Ar*_icle 32 of Title 34, C.R.S. 1973, as amended, (1976 <br />Sess. Lasas H.B. 1060 the :tined Land Reclamation Board of the State of Colorado <br />hereby issues a permit to The Atlantic Richfield Co. to '-ngo'-e <br />is construction of the access road and mine bench <br />on the fol'_owing parcel of ground, to wit: <br />Access Road <br />TSS, R96W <br />SE's, Sec. 12 <br />Ei, NE3, Sec. 13 <br />Mine Bench <br />TSS, R95W <br />Wz, Sec. 7 <br />TSS, R96W <br />W?, NW's, Sec. 18 <br />TJi, Sec. 7 <br />