Laserfiche WebLink
<br />~, <br />ENECA <br />S Coa/Company ~, Seneca Coal Company <br />~~~ <br />~l <br />RECEIVED <br />JUL 261999 <br />Division of Minerals 8 Geolo9Y <br />July 22, 1999 <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Quarterly Sedimentatioa Pond Inspections - Seaeca II Miae <br />Dear Mr. Boulay: <br />Enclosed is the second quarter inspection reports for Ponds 002, <br />003, 004, 008, the PeCoCo Reservoir, Spill Control Pond #2 and <br />both truck wash ponds at the Seneca II Mine. All conditions <br />appeared stable and acceptable. <br />If you have any questions, please ca11 mo- <br />P.E. <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />JUL 22 1999 <br />