My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28908
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:00 PM
Creation date
11/20/2007 10:04:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Hydrology
Doc Date
1/29/1986
Doc Name
SEDIMENT POND CERTIFICATION EASTSIDE MINE FN C-84-063
From
EASTSIDE COAL CO INC
To
DNR
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~"yT~ <br />~~~~~, <br />JAN 2 9 1980 <br />SEDIMENT POND SP-1 CERTIFICATION <br />Eastside Mine, Garfield County, Colorado <br />~iilliir~ 1.Ai'a~ f;41"i.x'• °S~i{}~1 <br />Colo. Uc,~2 ct ~~,:~~.r,.! ~c~;~, .:.~ <br />During August 1985, Eastside Coal Company, Incorporated constructed <br />Sediment Pond SP-1. The construction of the pond was supervised by <br />Stephen Self, P.E., whom is experienced in earthen construction design <br />and supervision. Mr. Self is a professional Engineer registered in the <br />State of Colorado. <br />The purpose of the inspection and certification is to ensure proper <br />construction of the Sediment Pond SP-1 and to satisfy the requirements <br />of Rule 4.05.6(7) of the Colorado Mined Land Reclamation Board. In <br />completing nU' certification, I have reviewed the approved design criteria <br />for Sediment Pond SP-1 and observed construction of the pond. <br />The vegetation was removed from the construction site and the pond <br />embankment was staked for construction. The embankment material was <br />obtained from the pond area, water was added to both the fill and borrow <br />areas to bring the material a level where compaction could be achieved. <br />The equipment was routed over the embankment to obtain compaction. <br />To the best of ~ knowledge, based upon my professional expertise, <br />the Sediment Pond at the Eastside Mine was constructed in conformance <br />with prudent state-of-the-art of earthen embankment construction. Further <br />the sediment pond was constructed in compliance with the approved design, <br />as specified with Section 2.05.3 of the approved permit documents and <br />depicted on drawing 3. <br />I certify, based upon field observation and professional investigation, <br />as detailed here above, that Sediment Pond SP-1 at the Eastside Coal Co., <br />Inc. Eastside Mine, located in Garfield County Colorado, was constructed <br />in compliance with the. design approved as a portion of Permit C-84-063. <br />issued by the Colo,..rado~,Mined.Land Reclamation Division. <br />~ Stephen Self ~~„ }n 1`" <br />~,`' ,. <br />I Colorado Registered„P.E. No.,~d29,] <br />,~ %;. <br />-, ;../ <br />~_~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.