Laserfiche WebLink
~, ~ ~P <br />%~~~~L~ <br />G <br />../ JJ~ BATTLE MOUNTAIN RESOURCES, INC. <br />March 09.2006 ;~~(~~~v ~.LJ <br />Mr. Allen Sorcnscn ~hAR ~ Z~a6 <br />Slate nfColomdo <br />Division of Minerals and Geology ~~M,rorel<s^ad' <br />1313 Sherman Street, Room 215 a'~°"1O`~ <br />Drnvcr, CU 80203 <br />Rc: Rattle Mountain Rcscwrces Inc. <br />San Luis Project ~ <br />CMI.RB Permu No. M-88-I 12 <br />Fehrwry 2006 Monthly Report ~/ <br />Dear Mr. Sorensrn: <br />the following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI1, San Luis Pmjat feu the month of F'cbnrary 2006. <br />Surface and ground water monitoring and analyses wrro compktrd for all requital sites during <br />the month P~'r the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/q('1 plan. <br />Vacuum on the tailing IysirrMers was verifiod on F'ebrusry 28", no watcv was presem for <br />sampling and subsequent analysis. <br />Depths to water were collected fie the tailing impoundmrnt main cmhankmrnt piezcxrtcters and <br />the West Pit and tailings embanlmrnt monitoring wells wuc collected on Februan 2i"", <br />fcbruary (ailing impowxhnrnt pirmmrher meastuements idrntifrod these irrstallotions were atbcr <br />dry or contained less Ilran 12 inches of water ss illustratod in 'fable 2 Tables I aad 2 txlow <br />idartify the depth to water mmwrcrnents collared for cacti of the site monitoring wells, <br />picnotttetcrs and lysimoters as required by the terms and oarditions of the TR-32 QA,^QC plan. <br />the tailing impourdmprt collectiort pond rmtlerdrain flow wax pumpod intermittently during the <br />month to rninmrizc the collection pord level. The kale detaxiar system was mcasural on <br />Febttury 28°. The Febnury tailings pond urderdrain flow average was 47.54 gpm and a total of <br />890 gallons of water was etccavatod from the Icalc detoction system yielding a monthly average of <br />30.69 gpsd. <br />During February, the West flit water orcetrrteat plant operated cfFiciagly diu-ftuging a total of <br />7,011,900 gallons (21.52 acre-foot) of water to Rito Sono Crook and a total of 358.300 gallons <br />(I . l U acre-feet) of water was transferred from the water trsatrrteat pleat to the tailings <br />impoundment. Seepage along Rito Soto Crock remained dry dtsiag the month. The monthly <br />procipiution acctmrulation for Februsry was 0 inches. <br />