Laserfiche WebLink
~~~ ~ <br />III IIIIIIIIIIIIIIII <br />999 <br />Ronald G. Thompson <br />Peak Project Management <br />3800 County Road 63.9 <br />Trinidad, Colorado 81082 <br />(719) 846-2427 <br />August 20, 2001 <br />Mr. AI Weaver <br />Energy Fuels Coal, Inc. <br />P. O. Box 459 <br />Florence, CO 81226 <br />Re: Raton Creek Mine <br />Quarterly Sediment Pond Inspection <br />Certification of Quarterly Inspection <br />Dear AI: <br />n ~ '~ <br />eJ ~,d d <br />On June 6, 2001, the sediment control pond at Raton Creek was inspected for structural integrity, erosion, <br />hazardous conditions, and to identify required maintenance. The inspection also satisfies Rule 4.05,9 (]3) <br />of the Colorado Mined Land Reclamation Boazd for Coal Mining. <br />To the best of my knowledge, based upon my field observations and investigations, as detailed in the <br />attached inspections report, the referenced pond is being maintained in conformance with prudent, state-of- <br />the-art earthen embankment construction. <br />Sinc ely, <br />~e~~~ <br />Ronald G. Thompson <br />MSHA Certified -Impoundment Inspections <br />[ have reviewed these reports and certify that a qualified person under my direction has inspected these <br />ponds. G !'~/;~ <br />`. ~rles W. McGlothlin, P. E. <br />- Colorado Registration No. 2832 <br />-~.;; <br />.'.:. ~'~ r,~ <br />