Laserfiche WebLink
Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORN - EQUIPMENT MOBILIZATION / OEHOBILIZATION <br />• Task #... 23 Prep. by ESC Fi lename..C008-23 <br />____________ <br />Date..... 29-Nov-95 Permit # ________ __________ <br />C-81-008 Hine.....-Neu HOr1ZOn #2 Hine <br />Permit Action........ Midterm Review 1995 <br />Task Description..... HobilizaTion/Dtmobili znti on <br />HOURLY EOUIPHEHT COST <br />_____________________ NOTE - This is a list to select from, not a li st of manda tory items [o inc lode. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GW, 375 HP, diesel powered <br />-lt. Trailer 25 ton folding gooseneck, drop deck <br />-Med. Trailer 50 ton folding gooseneck, drop deck <br />-Hvy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 [on rating, gasoline powered <br />-Hyd. Crane Grove RTSSD rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 f[. boon <br />-Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20,000 lb GVN, 175 HP, diesel powered <br />Last Update: __________________________-_____~__________ ____________ ________________ ___________ <br />December, 1994 <br />------------ Lt. Rig Med.Rig Nvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. <br />_______________________________ 26-50 T- > 50 T- Car Crane <br />______________________________________________ Truck <br />____________ Truck <br />________________ Truck <br />___________ <br />_______________________________ <br />;: <br />Ownership Cost/hr = 527.88 ______________________________________________ <br />531.23 438.36 21.81 519.89 ____________ <br />56.95 ________________ <br />212.79 ___________ <br />55.71 <br />~ <br />Operating Cost/hr = 526.84 E29.29 534.27 E5.12 823.40 218.53 224.52 58.00 <br />Operator Cos[/hr = 521.40 E22.03 E22.03 521.24 220.86 521-24 E21-24 521-24 <br />Helper Cost/hr = 820.60 521.24 521.24 50.00 50.00 50.00 50.00 50.00 <br />Total = E96.72 5103.79 5115.90 528.17 564.15 E46.72 558.55 534.95 <br />NON-ROADABLE EQUIPMENT: <br />---------------------- Height Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description <br />_______________________________ <br />___ (tons) Cos[/hr Cost/hr (no. hauled) <br />_______________________________________________ Cos[/hr <br />___________ Cost/hr <br />_________________ Cost/ea <br />__________ <br />____________________________ <br />CAT 09N-U Dozer _______________________________________________ <br />58.40 549.96 5115.90 2 ___________ <br />5331.72 _________________ <br />5231.80 __________ <br />50.00 <br />CAT 637E P-P Scraper 57.74 570.46 E115.90 4 5745.44 5463.60 50.00 <br />CAT 14G Motor Grader 22.22 E38.43 596.72 1 5135.15 596-72 50.00 <br />CAT 8156 ComQac for 22.09 544.61 596.72 1 5141.33 596.72 50.00 <br />cAT 9888 HL Loader 53.43 550.17 E115.90 1 2166.07 5115.90 50.00 <br />Revegetation Equi Anent 30.00 260.00 5103.79 1 5163.79 5103.79 <br />Revegetation Equipment 30.00 560-00 5103-79 1 5163.79 f103.79 <br />(Reseeding) <br />Sediment Pond Removal 58.40 E49.96 E115.90 1 5165.86 5115.90 <br />________________ __ <br />_____________________________________________________________________________________________ <br />Subtotals 22,013-15 21,3Ze.ZZ EO-00 <br />!~ <br /> <br /> <br />