Laserfiche WebLink
sheet 1 of ;~ <br /> Colorado Division of Minerals and Geology <br /> ESTIMATING <br />FORM <br />= <br />STRUCTURAL DEMOLITION <br />t70RK <br />• Task No.: 21 - <br />- <br />- - <br />Prepared b/ ESC <br /> Permit No.: C-81-008 Filename 0008-21 <br /> Dale 28-Nov- <br />___ 95 <br />__ Operation Neu Hori zon #2 Mine <br /> <br /> <br />Permitting acti __________ <br />_ <br />on Midterm Review _ <br /> <br />1995 ________ _______ __ <br />_-__-__ 1 <br /> Task descripti on Structural Demo lition <br /> MEANS Location Adjustment: tO5. 50X of base unit costs - MEANS SITE NORK 8 LANDSGPE COST DATA 1995 Edition <br /> ____- <br />MEANS BASEI <br />ADJUSTED <br /> STRUCTURE / FACILITY / EOUI PNENT DESCRIPTI ON I DIMENSIONS ~ CCHPOSITION ~ OUANTIiY ~ UNIT ~ UNIT COST ~ TOTAL COST <br /> Truck Shop Building - Superstructure ~ 197,925 cu.ft. ~ Steel ~ 197,925 ~ cu.ft. ~ 50.18 ~ 537,586 <br /> - Floor (8"D.u/rods) ~ 7,341 sq.ft. ~ <br />G Concrete ~ 7,341 ~ sq.ft. ~ 53.94 ~ 530,514 <br /> Change House Building- Superstructure ~ 7,920 cu.f[. ~ Steel ~ 7,920 ~ cu.ft. ~ 50.18 ~ 51,504 <br /> - Floor (8"D.u/rods) ~ 830 sq.ft. ~ Concrete ~ 830 ~ sq.ft. ~ 53.94 ~ 53,450 <br /> Truck Vash Pond Slab 8 Ramp ~ 546 sq.ft. ~ Concrete ~ 546 ~ sq.ft. ~ 53.94 ~ 52,270 <br /> Truck Wash PunQ Pad ~ 11 sq.ft. ~ Concrete ~ 11 ~ sq.ft. ~ %3.94 ~ 546 <br /> Fueling Station Slab ~ 116 sq.f t. ~ Concrete ~ 116 ~ sq.ft. ~ 53.94 ~ 5482 <br />'\ <br />I Fuel Pimp Pads ~ 11 sq.ft. ~ Concrete ~ 11 ~ sq.tt. ~ 53.94 ~ 546 <br /> Nine Office - Superstructure ~ 35" 40"10' ~ Steel ~ 14,000 ~ cu.tt. ~ 50.18 ~ E2,659 <br /> - Floor (8"0. u/rods) ~ 35 " 40' ~ Corxrete ~ 1,400 ~ sq.f T. ~ 53.94 ~ 55,819 <br /> Training Building - Superstructure ~ 25 " 35 "' 10' ~ Steel I 8,750 ~ cu.ft. ~ E0.18 ~ 21,662 <br /> - Floor (8"D.u/rods) ~ 25'* 35' ~ Concrete ~ 875 ~ sq.ft. ~ 53.94 ~ 53,637 <br /> tlarehouse - Superstructure ~ 40"' S0'" 15' ~ Steel ~ 30,900 ~ cu.f t. ~ 50.18 ~ 55,697 <br /> - Floor (8"D.u/rods) ~ 40" 50' ~ Concrete ~ 2,000 ~ sq.ft. ~ 53.94 ~ 58,313 <br /> PalLat Storage - Superstructure ~ 100' " 30'* 10' ~ Steel ~ 30,000 ~ cu.ft. ~ 50.18 ~ 85,697 <br /> - Floor (B"D.u/rods) ~ 100' ' 30' ~ Concrete ~ 3,000 ~ sq.f t. ~ 53.94 ~ 212,470 <br />Culvert Removal <br />C-101 ~ 36"D. ' 80'L. ~ CMP ~ 80 I lin.ft.l 54.66 I 5393 <br />C-102 136"D. " 120'l. I CHP ~ 120 ~ lin.ft.~ 54.66 ~ 2590 <br />C-103 ~ 36"D. * 200'L. ~ CMP ~ 200 ~ lin.f t.~ 24.66 ~ 5983 <br />C-106 ~ 36"D. • 120'L. ~ CMP ~ 120 ~ lin.ft.~ 54.66 I 5590 <br />No[ Named ~ 24"D.' 80'L. ~ CMP ~ BO ~ lin.f[.~ 52.66 ~ 5225 <br />C-107 ~ 36"D. ' 40'L. ~ CNP ~ 40 ~ lin.ft.~ 54.66 ~ 5197 <br />C-108 ~ 30"D. • 60'L. ~ CMP ~ 60 ~ lin.ft.~ 53.58 ~ 5227 <br />Proposed C-109 ~ assure 36" • 80'L. ~ CMP ~ 80 ~ lin.ft.~ 54.66 ~ 5393 <br />Proposed C-110 I assure 36" ' 80'L. I CHP 80 ~ lin.ft. 24.66 ~ 5393 <br />Proposed C-111 ~ assure 36" • 80'L. ~ CMP ~ 80 ~ lin.ft.~ 54.66 ~ 5393 <br />C-113 ~ 36"D. ' 80'L. ~ CHP ~ 80 ~ lin.ft_~ 54.66 ~ 5393 <br /> _____________________ _______________ <br />TASK ___________ <br />SUBTOTAL - __ ________ <br />sheet 1 __ <br />2126,629 <br />li <br />