Laserfiche WebLink
• <br /> <br />Task Description: <br />Western Fuels-Colorado <br />Reclamation Cost Summary Form <br />TASK #: 8 PREP. BY: ROSS L. GUBKA, P.E. <br />Date: 10-8-97 OPERATION: NEW HORIZON MINE #2 <br />PERMIT#: C-81-008 <br />Rip Facility Area <br />HOURLY EQUIPMENT COST <br />CosUHr Breakdown <br />MATERIAL QUANTITIES <br />Seismic method <br />Load Factor: <br />Bank Volume: <br />Area Method: (acres) <br />dip Depth: <br />volume (BCY) <br />Source of quantity take-off: <br />HOURLY PRODUCTION: <br />Basic Machine: Caterpiller D9R <br />Blade type: Semi-Universal <br />Attachment #1: ROPS Cab <br />Attachment #2: 1-shank ripper <br />ownership :...................................................................... <br />material & supplies plus repairs :.................................... <br />operator <br />Total equipment cost per hour <br />Contractors contingencies <br />Net equipment cost per hour <br />N/A <br />N/A <br />N/A <br />18 <br />3 <br />87,120 <br />3.02.2-37 <br />Area Method- Avg. ripping depth per pass (ft) :..................................... <br />Avg. ripping width per pass (ft) :...................................... <br />Avg. ripping length per pass (ft) :.................................... <br />avg. velocity of machine :............................................. <br />Avg. machine maneuver time :........................................ <br />Hourly prod. per unit area :............................................. <br />Unadjusted hourly production ........................................ <br />Correction Factors Unadjusted Production :.................................................. <br />Site altitude :................................................................. <br />Altitude adjustment :...................................................... <br />Job efficiency factor :...................................................... <br />Net correction :................................................................ <br />Adjusted production :...................................................... <br />Fleet production :............................................................ <br />JOB COST: <br />Fleet Size 1 <br />Total Job Time (Hr): 85.88 <br />r Unit Cost ($/LCY) $0.0974 <br />~' Total Job Cost <br />C:\DATA10PR0\PERMIT\96PERMIT\REVISION\BONDCALa. WB1 <br />Shifts: <br />$16.36 <br />$37.18 <br />25.48 <br />$79.01 <br />125% <br />$98.76 <br />1.50 <br />6.00 <br />50.00 <br />88 <br />0.25 <br />0.505 <br />1,222 <br />1,222 <br />5700 <br />1 <br />0.83 <br />0.83 <br />1,014 <br />1,014 <br />$8,482 <br />~~}~1 Rocie4~nra /°/ 1 d <br />