Laserfiche WebLink
Western Fuels-Colorado <br />• Reclamation Cost Summary Form <br />TASK #: 4 ROSS L. GUBKA, P.E. <br />Date: 10-8-97 OPERATION: NEW HORIZON MINE #2 <br />PERMIT #: C-81-008 <br />Task Description: Remove surface Material from Facilities area and Haul to Pit page 1/2 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Caterpiller D9R <br />4 -Caterpillar 637E Push-Pull Scapers <br />100% <br />$70.46 <br />$132.02 <br />$23.13 <br />$225.61 <br />$902.44 <br />Shifts: 1 /day <br />Equipment: <br />Utilization: <br />Ownership cosUhr: <br />Operating cost/hr: <br />Opeator cosUhr: <br />sub-total <br />Scraper Team cosUhr <br />Equipment: <br />Utilization: <br />Ownership cosUhr: <br />Operating cosUhr: <br />Opeator cost/hr: <br />sub-total <br />Equipment: <br />Utilization: <br />Ownership cosUhr: <br />~perating cost/hr: <br />peator cosUhr: <br />sub-total <br />Total Work Team cost/hr: <br />Material Quantities <br />1 -Caterpillar 14G Grader <br />50% <br />$38.74 <br />$18.16 <br />$23.13 <br />$80.03 <br />1-5000 gallon water truck <br />50% <br />$24.11 <br />$18.27 <br />$20.78 <br />$63.16 <br />$1,045.63 <br />Volume: 28,700 <br />Swell 1 <br />Loose Volume: 28,700 <br />HOURLY PRODUCTION <br />Scraper Cycle Time <br />Load (Minutes) 1 <br />Maneuver & Spread (Minutes)= 0.6 <br />Job Condition Correction Factors <br />Site Altitude+ (ft) <br />Alt. adjustment <br />Job efficiency <br />Net Correction <br />HAUL ROUTE <br />road Seg. # <br />length (ft) <br />Grade res (%) <br />Rolling res (%) <br />~tal Resistance (%) <br />locity (fpm) <br />travel time (Minute) <br />5700 <br />0.97 <br />0.83 <br />0.8051 <br />1 <br />3800 <br />1.3 <br />3 <br />4.3 <br />2502 <br />1.87 <br />., <br />C:\DATA\QPRO\PERMIT\96PERMIT\REVISION\BONDCALa.W61 <br />