Laserfiche WebLink
L. DRILL HOLE/MONITORING WELL SEALING <br />•ASK No. Task Description Cost ($) <br />17A Seal Underburden Monitoring Wells $1,530 <br />17B Seal Dakota coal Monitoring Wells $1,540 <br />17C Seal Overburden Monitoring Wells $796 <br />17D Seal Alluvial Monitoring Wells $231 <br />subtotal fLl 4 097 <br />M. MISCELLANEOUS RECLAMATION TASKS <br />TASK No. Task Description Cost ($) <br />31 Pit Turn Slot seedirig $12,154 <br />21 Demolition $127,009 <br />22 Seeding $88,214 <br />23 Mob/Demob $26,048 <br />subtotal IM) 253 425 <br />TOTAL DIRECT RECLAMATION COST (subtotals A through M) $1,054,624 <br />II. INDIRECT COST <br />CONTRACTOR'S OVERHEAD &PROFIT <br />TASK No. ITEM DESCRIPTION Cost ($) <br />1 Public Liability Insurance..... 1.55% of dir. 0.0155 $16,347 <br />2 Contractor's Pertormance Bond 0.975% of dir. 0.00975 $10,283 <br />3 Contractor's Profit 10% of dir 0.1 $105,462 <br />4 Job Superintendent $18,715 <br /> subtotallAl 150 807 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus O & P) <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />TASK No. ITEM DESCRIPTION <br />1 Project engineering fees at 6.00% of contract <br />2 Staff admin. expense 4.50% of contract <br />NET INDIRECT COST PERCENTAGE: 25.88% <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A throough B) <br />• <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs) <br />0.06 <br />0.045 <br />subtotallBl <br />$1,205,430 <br />Cost ($) <br />$72,326 <br />$54,244 <br />126 570 <br />277 377 <br />$1 332.001 <br />C:\DATA\OPRO\PERMIT\96PERMIT\REVISION\BONDCALa. W61 <br />