Laserfiche WebLink
ESTIMATING FORM - REVEGETATION tx7RK cont'd Filename 0008-9c sheet 2 of 2 <br />B. SHRUB 8 TREE TRANSP LANTS <br />_______________________ _____ ~ I MATERIAL: PLANTING: I S/PERT. I TOTAL ~ TOTAL <br />SPECIES NAME <br />____ <br />_______________ ~ oUAN./ACRE <br />__ ~ STOCK TYPE 8 SIZE ~ S/PLANT ~ <br />_ 2/PLANT ~ PELLET I S/PLANT ~ S/ACRE <br />_ <br />___ <br />Oldman 4ornraood __________ <br />~ 100 ~ 7ubling. ..17-20 cu.in. ~ 50.88 ~ 51.07 ~ 21.74 ~ 53.69 ~ 2369.00 <br />Shadscale saltbush ~ 100 ~ Tubling. .. 17-20 cu.in- ~ 50.88 ~ 51.07 ~ 51.74 ~ 53.69 ~ 2369.00 <br />Mexican Cliffrose ~ 100 ~ Tubling. .. 17-20 cu. in. ~ 50.88 ~ 21.07 ~ 51.74 ~ 53.69 ~ 5369.00 <br />Rocky nauntein juniper ~ 100 ~ Tubling. .. 17-20 cu.in. ~ 50.88 ~ 51.07 ~ 51.74 ~ f3.b9 ~ 5369,00 <br />P <br />flood rose <br />~ 100 <br />~ Tubling. <br />.. 17-20 cu. in. <br />~ 50.88 I <br />51.07 <br />~ 51.74 <br />~ 53.69 ~ <br />5369.00 <br /> Total transplant cost/acre: 51,845.00 <br />C. SEEDBED PREPARATION <br />_______________________ =___________ <br />_______________________ <br />Tilling method #1= <br />No seedbed p <br />repara[i on <br />cork required <br />SO.OD <br />#2: <br />D. SEED APPLICATION <br />_______ <br />_ w Total cos[/acre= 50.00 <br />__ <br />Seeding method: <br />No seed applica [ion required <br />Total <br />cost/acre: ____________ <br />50.00 <br />E. FERTILIZING <br />_______________ FERTILIZER / SOIL AMENDMENT <br />Materials used #1: No fertilizer/amendnents required <br />#2: <br />#3: <br /> <br /> <br />Application method #1: No fertilizer application required <br />#2= <br />UNITS/ACRE ~ UNIT ~ E/UNIT ~ S/ACRE <br />50.00 <br />=__-_____- I =________= I =______- I =_-_________ <br />Total materials cost/acre= 50.00 <br />50.00 <br />r Total application cost/acre: 50.00 <br />F. MULCHING =___________ <br />MULCH / NETTING / OTHER MATERIALS ~ UNITS/ACRE ~ UNIT ~ S/UNIT ~ S/ACRE <br />______________________________-_____________====I==-=--___~_____=====I====-_-I=====____-__ <br />Materials used #1: No nulch nw serials required ~ ~ ~ ~ 50.00 <br />#2: <br />i13: <br />#4: <br />Total materials cost/acre: 50.00 <br />____________ <br />Application method #1: No mulch application required 50.00 <br />#2: <br />#3: <br />Total application cos[/acre: 50.00 <br />G. JOB COST =___________ <br />Total area [o be seeded: 1.50 acres. Total S/acre = 51,845.00 Total Initial Job Cost= 52,767.50 <br />___________ _________ ____________ <br />Estimated failure rate: $O.OOX of area. Total 5/acre' 51,845.00 Total Reseeding Costs = 51,383.75 <br />_________ _ g _________ - ___ <br />' Reseedin cos[ items- B GRAND TO TAI JOB COST 54,151.25 <br />