My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67763
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67763
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:28 PM
Creation date
11/20/2007 10:02:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 19 WEST PIT EXCESS SPOIL FILL & SECTION 16 EXCESS SPOIL FILL
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised, lvovember 18, 1992 <br />2. Each certified inspection report will be provided to the <br />r Division within two weeks after each required inspection. <br />Each report will certify that the fill has been <br />constructed as specified in the minimum design approved <br />by the Division. The reports will include a description <br />of any appearances of instability, structural weakness <br />and other hazardous conditions observed during the <br />inspection. Colowyo also intends to submit with these <br />reports the final as-built drawings for the fill <br />including among other items, the details of where the <br />approved fill design has been exceeded. <br />3. Certified reports addressing the underdrain system will <br />include color photographs taken during and after <br />construction, but before the underdrain is covered with <br />spoil. <br />After construction, the West Pit Fill will be monitored <br />quarterly for the following items and reports will be submitted in <br />the Annual Reclamation Reports. <br />1. The groundwater piezometer well will be established in <br />the valley bottom and will be monitored quarterly for <br />water level and the other parameters consistent with the <br />present Colowyo groundwater monitor plan. For a proposed <br />~. location of the well see the attached map. <br />2. On a quarterly basis the survey monuments on the face of <br />the fill will be monitored for horizontal and vertical <br />movement. For the proposed location of the monuments, <br />see the attached map. <br />3. On a quarterly basis a certified report by a registered <br />engineer will be completed taking into consideration any <br />changes in the results of items 1 and 2 above and will <br />note any evidence of surficial slope failure or the <br />formation of springs or seeps on the face of the fill. <br />~~ I a-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.