Laserfiche WebLink
E OR PRINT CLEARLY _ <br />14. Present land use ~ <br />~•Jil~life :3abitat <br />(i.e., agricultural, industrial, etc.) <br />15. Proposed future land use 'dildlifa H:~hifat <br />(Goal of reclamation) <br />INSTRUCTIONS: This application form must be submitted in duplicate and each form must <br />be accompanied by the following inforvation and items. The application <br />will not be processed until complete. See RULE 3 {for Limited Impact) <br />or RULE 4 (for Special 10-day) for additional guidance. <br />F:~1iIBIT A - I.e~a1 Description <br />The legal description must identify the affected land and be wholly adequate for <br />field location of the property. It can be in the form of metes and bounds survey <br />or a description by reference to township, range, and section to at least the <br />nearest puarter quarter section. I~Tnere applicable, the street address or lot <br />number(s) may be used. <br />E?Q?IBIT B - Niininq Plan <br />This can be a general discussion of the methods, equipment, phasas or stages of <br />the operation and those portions of Land affected by each. The plan should be <br />closely correlated with the map and should show where extraction will begin, which <br />direction it will proceed. <br />E'OiTBIT C - bfap <br />This map should be as comprehensive as possible in terns of clearly defining <br />the permit boundaries and indicating all roads or stn=lcpile areas to be used in <br />connection with the operation. All im•nediately adjacent landowners must be shown. <br />The closest quarter section corner, section Line, or any other locateable point <br />should also be shown on the Pap. <br />EXHIBIT D - Wildlife, Water Resources, Veeetation and Soils Inforaation <br />Each of the above-mentioned subjects must be addressed as outlined in the <br />applicable Rule, under item number tea (10). <br />EXHIBIT E - Reclamation Plan <br />As with the mining plan, this should be a general discussion of the methods, <br />equipment, phases or stages of the reclamation process and those portions of <br />land affected by each. If possible, the plan should be closely correlated <br />with the map. If not, the narrative must be comprehensive enough to draw an <br />accurate verbal picture of the expected physical appearance of the area after <br />completion of reclamation. <br />r.~iIBIT F - Proof of Local Government Approval <br />This must be a letter from the local government specifying conformance with <br />existing zoning regulations. <br />EXHIBIT G - Source of Leeal Right to Enter <br />This could be a copy of the lease, deed, abstract of title, or current taz <br />receipt. In lieu [hereof, a statement acknowledged by a notary public that <br />the operator has the legal right to enter and mine trill be accepted. <br />**FOR SPECIAL 20-DAY P°RHITS O\TLY** <br />EXHIBIT H - Reclamation Costs <br />If the surety i.s requested to be less than $2500, the operator must submit <br />facts to support such request. Otherwise a surety of $2500 will automatically <br />be set. <br />EXHIBIT I - Terms of Covernmeatal Contract <br />The operator must submit a copy of the contract or other proof that proves the <br />necessity of a special 10-day persit. The operator must also submit evidence <br />of the surety provided under the governmental contract. if iL was required. <br /> <br />