My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67616
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:21 PM
Creation date
11/20/2007 9:58:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001114
IBM Index Class Name
Permit File
Doc Date
2/6/2002
Doc Name
Reclamation cost estimate
From
DMG
To
Loukonen Bros. Stone Company
Section_Exhibit Name
Permit documents
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 30-Jan-2002 Permit or job no.: M-2001-114 Site :Starks Quarry <br />User : ACS Abbreviation : none State :Colorado <br />Filename : M114-000 County : Latimer <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or job action :New application, sandstone quarry <br />TASK LIST DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br /> <br />001 -Mobilize and demobilize equipment needed for reclamation mobilize 4 8.0 $2,476 <br /> <br />002 -Backfill rubble into highwaU along soutwest side o1 permit area truckl 4 113.0 $37,719 <br /> <br />003 -Spread stockpiles soil from the quarry perimeters back over the mined ar dozer 1 92.0 $10,521 <br /> <br />004 -Revegetate quarry area revege 1 40.0 $9,177 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />sularorALS: 253.0 $59,893 <br />'includes inflation factor adjustment oL NA % TOTAL DIRECT COST = $59,893 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability IDSUranCe : 1.55 % of direct total = $928 <br />Performance bond : 1.05 % o/direct total = $629 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $5,989 <br />'not required (or eqp. operator serves as super.) TOTAL O & P = $7,547 <br /> CONTRACT AMOUNT (direct+08P)= $67,440 <br />PROJECT MANAGEMENT- <br />Engineeringwork and/or contracVbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of colt. NA total = $3,372 <br />coNnNGENCV- NA' NA total= NA <br />'contingencies accounted /Drat task level TOTAL INDIRECT COST= $10,918 <br />TOTAL BOND AMOUNT (direct + indirect) _ $70,811 <br />
The URL can be used to link to this page
Your browser does not support the video tag.