Laserfiche WebLink
<br />MAPS <br />1. Exhibit C-1, see enclosed copy <br />2. Exhibit F-1, see enclosed copy <br />3. Refer to Exhibit C for the roads to be utilized for the two vent holes <br />located in the NE', Section 19. These are existing roads bu have been <br />added to the affected area. Exhibit C-1 depicts the road be used <br />for the shaft area and waste dump. <br />To minimize downs lope spoiling on any cut and fill slope, ditch will <br />be cut on the upper side and waterbars placed at strategic locations <br />for water and erosion control. The fill areas will be be ed and then <br />seeded with a good erosion control vegetative cover, such as Stream- <br />bank Wheatgra~s. <br />During reclamation of the areas, the outside berm materia will be <br />pulled back into the roadway, and the loose uphill side terial will <br />be purled down for growth medium. The area will then be scarified and <br />seeded with the approved seed mixture. <br />