Laserfiche WebLink
~~~ ~~~~I~~I~I~~~ ~~~ <br />~~~~I~IED <br />J,'~f~ 0 8 1JG2 <br />December 30, 1981 <br />Natural Resources Department of Colorado <br />Division of Mined Land Reclamation <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />ATTENTION: Robert Liddle <br />Dear Mr. Liddle: <br />6hi~~Ej LAUD RfCLAINATIUN <br />Cola Dep?. of P'a?ural Resourco^ <br />On Tuesday, December 29, 1981, I inspected the ponds and ditches <br />for controlling run-off water and the pit water ponds at the <br />Adolph Coors Company Keenesburg Coal Mine. I can certify that <br />those ponds and ditches now constructed were built in accordance <br />with the design drawings. The design drawings were prepared to <br />develop the water control concepts approved in the reclamation <br />plan. The double pit water ponds, run-off ponds I11 and ir2, and <br />ditches #1, ii2 and part of N3 are now complete. Pond iii and extension <br />of ditch H3 are planned for the future as the need arises. <br />The Adolph Coors Company drawings for these facilities are listed <br />below: <br />Drawing No. Title <br />KM- 4-1 Overall Site Plan <br />KM- 4-2 Site Plan (NW area) <br />KM- 4-3 Site Plan (Load-out Facility Area) <br />KM- 4-4 Sediment Pond No. 1 - Plan & Details <br />KM- 4-5 Sediment Pond No. 2 - Plan & Details <br />KM- 4-6 Sediment Pond No. 3 - Plan & Details <br />KM- 4-104 Settling Ponds for P it Water <br /> Respectfully, <br /> <br /> Clifton C. bb <br /> P.E. Liscense No. 34 46 <br />CCC:tb <br />r ~ <br />