My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67496
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67496
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:15 PM
Creation date
11/20/2007 9:53:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979195
IBM Index Class Name
Permit File
Doc Date
10/23/1979
Doc Name
REGULAR 112 PERMIT APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • • XHIBIT D (Cont'd) <br />Soils vary in thickness from zero to one foot in a highly <br />' irregular pattern across the affected land. Sand strata from <br />three recent floods are readily observed. The soils which are <br />' present will be segregated carefully and stockpiled on the <br />' setback areas and, if necessary, a hold cover of western wheat- <br />grass will be used to minimize wind and water erosion as well <br />as deterioration of the soil. <br />The sand and gravel will be mined by dragline in a wet <br />' environment. No pumping to dewater or to lower the water level <br />' will be necessary. Since there will be no dewatering, no NPDES <br />permit is required. Likewise, there will be no effect on wells <br />' in the area. The dragline will work back and forth in a row <br />pattern, from north to south in the width of the stage. The <br />' row staging will start on the west side of the property and work <br />' to the east (see map Exhibit D-1). <br />n4ining equipment used may include, but is not limited to, <br />' dragline, bulldozers, front-end loader, scraper, conveyor <br />system, dump truck and water truck. <br />In a dragline operation the perimeter can either be sloped <br />' at 3 to 1 during the mining operation or left nearly vertical <br />and shaped to a 3 to 1 slope during the reclamation phase. In <br />' most instances 3 to 1 slopes will be created during the mining <br />operation. However, some of the perimeter will be sloped with ~/ <br />overburden, waste rock and silt, <br />~~ ~` <br />~\ ~^ <br />~ ~~~ - 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.