My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67496
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67496
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:15 PM
Creation date
11/20/2007 9:53:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979195
IBM Index Class Name
Permit File
Doc Date
10/23/1979
Doc Name
REGULAR 112 PERMIT APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' • • <br /> XHIBIT E (Cont'd) <br /> <br /> contain complete details and progression of mining stages and <br /> reclamation phases. <br />' Stage P is the acreage that will be disturbed b y Suburban's <br /> plant operations. There will be approximately 4.14 acres dis- <br />' turbed for the crushing plant haul road and scale. Over the life <br /> of the mine, the crushing plant and/or scale may be moved to as <br />' many as six locations on the property. As the plant is moved <br />_ so the ground it stands on can be mined, that amount of acreage <br />will be left undisturbed in Stage P to properly balance the land <br />t disturbed at any given time during operations. There will be <br />another 4.61 acres + disturbed in a life-of-the-mine location <br />for Suburban's concrete batch plant. Stage P will be counted as <br />disturbed over the entire life of the mine. <br />Suburban will attempt to complete grading, reshaping, seeding, <br />' mulching and fertilizing within one year of the completion of <br />each mining stage. <br />' Planting, mulching and fertilizing will occur in the fall of <br />each year whenever possible. If fall planting is not possible, <br />' we will plant between April 1 and May 15 in each revegetation <br />' year. During the two remaining years of a reclamation phase, <br />reclamation progress will be monitored and remedial work will <br />' be performed where necessary. <br />Reclamation Standards. Grading will create a topography <br />appropriate to the final land use. Initial mining methods and <br />' backfilling into the lakes will create irregular shorelines <br />1 - 13 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.