Laserfiche WebLink
The soil survey study area for the Yoast Development Area is as follows: <br />• <br /> Location Area <br /> (Acres) <br /> Mine Area (Exhibit 9-1, Sheet 1 of 21 <br /> T5N, R87W <br /> All of Section 17 631.1 <br /> Portions of Sections 7 79.3 <br /> 8 560.7 <br /> 16 320.3 <br /> 18 333.6 <br /> 19 391.6 <br /> 20 320.7 <br /> 29 40.6 <br /> 30 100.2 <br /> Subtotal 2,778.1 <br /> North Haul Road Corridor (Exhibit 9-1 , Sheet 2 <br /> 0 <br /> T5N, R87W <br />• Portions of Section 5 48.8 <br />T6N, R87W <br />Portions of Sections 28 39.8 <br />29 43.0 <br />32 50.5 <br />Subtotal 182.1 <br />TOTAL SURVEY AREA 2.960.2 <br />3.1 Data Review and Evaluation <br />All existing soils and related discipline information for the study area was compiled, reviewed, <br />and evaluated as preparation for initiation of soils field work. This review included the existing <br />SCS Order 2-3 soils information for the study area; Seneca II, II-W, and East Wadge Extension <br />Area baseline soil survey reports; maps and soils data generated during Gary WendYs (PWCC) <br />1989 soil survey of a southern portion of the study area; and other pertinent topographic, <br />climatic, geologic, and vegetative information. <br />Project maps and air photos were also reviewed to become familiar with the study area and to <br />• locate dominant topographic features as well as probable access routes to and from the acreage <br />7 <br />