Laserfiche WebLink
use is development of ponds to be used for <br /> fishing at such time as stocking is accomplished. <br /> The ponds will be separated by shaped dikes with <br /> at least three feet of freeboard, while being <br /> connected with pipes laid in the dikes . Water <br /> elevation in the ponds is controlled by an over- <br /> flow weir along the east side of the property at <br /> the existing drainage channel . Provision will be <br /> made in reclamation , for access to all locations <br /> along roadways on the dikes as required. Each <br /> slope of the dikes adjacent to water surface will <br /> be graded to no steeper than three feet horizontal <br /> for each vertical foot, and compacted using stand- <br /> ard heavy duty earthmoving equipment . The entire <br /> area of 129 acres will be reclaimed for recrea- <br /> tional purposes . <br /> b . This area can be reclaimed and used in much the <br /> same way as the Barbour Ponds along Interstate 2S <br /> approximately two miles west of this site . The <br /> reclaimed area used as a recreational area will <br /> fit well into the agricultural zoning of the local <br /> land use plan according to local zoning regulations . <br /> c ., The affected lands will be reclaimed for recrea- <br /> tional purposes within five years after each phase <br /> of reclamation is commenced. Use of the reclaimed <br /> land shall be in accordance with the limited <br /> liability landowner liability law contained in <br /> Article 41 of Title 33, C . R. S. 1973. <br /> c-1 . Grading - All grading will be accomplished as soon <br /> as feasible approximately one year after the mining <br /> process in a particular phase is completed, using <br /> heavy earthmoving equipment with all dikes and <br /> fills , except the top 6" to 12" , being compacted <br /> using standard compaction methods . All areas <br /> outside the site will be protected from erosion <br /> or siltation as a result of the operations . No <br /> refuse and acid forming or toxic materials that <br /> might create water pollution are anticipated to <br /> result from the proposed mining operation. No <br /> drill or auger holes , or shafts result from the <br /> mining operation. All finished slopes adjacent <br /> to water surfaces will have a finished slope no <br /> steeper than three feet horizontal to one foot <br /> vertical , while all other slopes will be approxi- <br /> mately 2 ' horizontal to 1 ' vertical . <br /> • <br /> 3 of 7 <br />