Laserfiche WebLink
"--. <br />EXHIBIT E <br />Reclamation Plan: <br /> <br />No pit reclamation, other than just smoothing the area <br />will be done as stream action during high water will <br />replace ttie gravel and smooth out the area. As there <br />is no natural vegetation on the creek bed there will be <br />no attempt to plant grasses. <br />At the time of reclamation no unsightly objects such <br />as rocks, roots or other debris will be left visible in <br />the area. <br /> <br />1 <br />