Laserfiche WebLink
Hazeltine/Road Runners Rest IllBrinkmann•Woodward Gravel Pits Lining Project -Design Technical Memorandum <br />Denver Water <br />August 2003 <br />Section 5 -Future Considerations <br />Based on the assumptions and considerations used for this study, the following issues need to <br />be addressed during future phases of the project: <br />1. Conduct analysis to identify appropriate rate of drawdown to maintain side slope <br />stability prior to lowering reservoir. <br />2. Conduct analytical and design work to select the permanent configuration of the side <br />slopes of the reservoir based on the anticipated reservoir operations (i.e., rapid <br />drawdown, long-term empty, etc.). <br />3. Evaluate the adequacy of the stabilization fill for the permanent side slopes based on <br />selected reservoir operations. <br />2a <br />GEI CORSllltanis, InC. 0}OSO Oi-01-?1 IA-HUelune DrslLn TM <br />