Laserfiche WebLink
• Ru 1e No. <br />• <br />• <br />SENECA II-w <br />LIST OF EXHIBITS <br />(Continued) <br />Exhibit No. Title <br />Volume <br />2.05.3(3) 13-15. 1 Plan 6 Profile, Haul Road C 10 <br />(COntinued) 13-15. 2 Plan fi Profile, Haul Road C 30 <br /> a~• <br />•~• <br /> a~• <br /> 13-18. 1A Road P (AS-Built) 10 <br /> 13-19. 3A Haul Road G (AS-Built) 10 <br /> 13-19. 2A Haul Road C (A9-Built) 10 <br /> 13-19. 3A Haul Road G (AS-BUilU 10 <br /> 13-19. 4A Haul Road G (AS-Built) 30 <br /> 13-20. 1 A Haul Road H (As-Built) 10 <br /> 13-21. 1 Haulroad •'I' Plan fi Profile Design 30 <br /> 13-22. 1 Haulroad •J" Plan S Profile Design 10 <br /> 13-23. 1 Haulroad "K^ plan fi Profile Design 10 <br />2.05.6 3 16-1 Water Rights 11 <br />2.06.8 16-2 Alluvial Deposits Along Dry Creek, Sage <br /> Creek, and Grassy Creek, Sheets 1 and 2 of 2 11 <br /> 16-3 Land Use, Flood Irrigated, and Subirrigated <br /> Areas Along Dry Creek, Sage Creek, sad <br /> Grassy Creek, Sheets 1 and 2 of 2 11 <br /> 16-3A Alluvial Valley Floor 13 <br />2.05.6.3 17-1 Mining Induced Drawdowns in the Overburden <br /> and Wadge Coal Aquifers 12 <br />17-1A Mining Induced Drawdowns for Overburden 6 <br /> Wedge Coal Aquifer 12 <br />17-2 SEDIMOT II Watershed Boundaries 005 and 006 <br /> Gulch Watersheds 12 <br />17-3 SEDIMOT II Watershed Boundaries 005 and 006 <br /> Gulch Watersheds Postmining 12 <br />17-9 Plow Net Ana lyeis Wadge Overburden Aquifer 12 <br />2.05.4 19-1 Backf filling and Grading Schedule 12 <br />19-1A Backf ill fi Grading Schedule (II-w South) 12 <br />20-1 5-Year Permit Area Disturbance Map 13 <br />20-2 Postmining Topography 13 <br />20-2A Postmining Topography II-W South 13 <br />20-3 Postmining Topography Map, TAHR 13 <br />20-9.1 Pre- and Postmining Slopes Cross Section S-1 13 <br />20-4.2 Pre- and Postmining Slopes Cross Section <br /> S-2 fi S-3 13 <br />20-4.3 Pre- and Postmining Slopes Cross Section S-4, <br /> S-5 fi S-6 13 <br />20-4.4 Pre- and Postmining Slopes Cross Section N-1 & <br /> N-2 13 <br />20-4.6 Pre 6 Pastmin ing Cross-Sections II-W South 13 <br />20-5.1 Postmining Stream Channels 006 Gulch 13 <br />20-5.2 Postmining Stream Channels 006-NE1 13 <br />20-6.3 Postmining Stream Channels 006-NE2 and <br /> 006-NE1 (upper) 13 <br />20-5.9 Postmining Stream Channels 006-61 and 006-E2 13 <br />20-5.9 Postmining Stream Channels 006-SE1 13 <br />20-6.6 Postmining Stream Channels 005-E1 13 <br />20-5.7 Postmining Stream Channels 005 Gulch 13 <br />20-5.8 Postmining Stream Channels 006-NE3 and 006-NE4 13 <br />20-6.9 Postmining Channels Profiles for II-w South 13 <br />2.05.5 21-1 Topsoil Replacement 13 <br />22-1 Postmining Vegetation Map Mine Area 13 <br />22-1A Postmining Vegetation Map II-W South Mining Area 13 <br />22-2 Post Disturbance Vegetation TAHR 13 <br />^Regulation citations correspond to application form <br />4 Revised Qj101 <br />