Laserfiche WebLink
sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br /> TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :DMG <br />Task # : 04a State :Colorado Pennit/job # : M-2005-071 <br />Date: 04/20/2006 County:Delta Abbreviation :none <br />User : SSS Site :Benson Bros Red Shale Pit Filename : M071-04a <br />Permit or other job action :New 112c permit application <br />Task description :Haul topsoil from stockpiles to locations across mine benches <br />~_ ~. __..__ ..._...._ _-_...T_ -. _--____.__ .._.. _._ ,_ __.._ _ _ ._...___ __.~...... _ _ _ <br />HOURLY EQUIPMENT COST Shift basis : 1 per tlay <br />(Equipment Description <br />Truck/loader team -Truck: <br />-Loader: <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water track <br />uric 10.12 cy, 6x4 <br />950G (2002) <br />Tanker $500 Gal. <br />Cost Breakdown : Tmck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA misctruk <br />°/,Utilization-machine: 92 100 NA NA NA 20 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost hour: $16.84 $18.57 NA NA NA $10.95 <br />Operating cosUhour : $23.70 $28.00 NA NA NA $4.12 <br />Ripper op. cosOhour : NA NA NA NA NA NA <br />Operator cosOhour : $21.75 $32.53 NA NA NA $21.16 <br />Unit subtotals : $62.29 $79.10 NA NA NA $36.23 <br />Number of units : 2 1 0 0 0 1 <br />Group subtotals : Work : $203.69 Support : $0.00 Maintenance : $36.23 <br />Total work team cosUhour : $239.92 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 807 LCY factor : NA volume : 807 LCY <br />Source of quantity take-off :Assume 3 acres covered with 2 inches of topsoil <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />t.. .____ ..__.______.___._. _.___-_._ _.._ _. _.__..m_. _. <br />HOURLY PRODUCTION <br />Truck Caoaciri <br />Truck Pavload (weight) Basis : Truck Bed (volume) Basis <br />Descr. <br />Matedal weight : 1,600 pounds/LCY Struck volume : 10.00 LCY <br />Soil Heaped volume: 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity : 22.12 LCY Adjusted volume`: 12.00 LCY <br /> Final truck volume based on number of loader passes : 11.81 LCY <br /> 'truck volume atljusted to not exceed rated payloatl or heaped volume <br />Loading Tool Cagaeiri <br />Rated capacity (nom. heaped) : 3.750 LCY <br />Descr.:Other-moist loam (100-110%) <br />Bucket fill £actor : 1.050 <br />Adjusted bucket capacity : 3.938 LCY <br />Job Condition Corrections : Site altitude (fl.) : 6,340 <br /> Truck Loader Source <br />Altitude adj.: 1.000 1.000 (Cat HB, <br />Job efficiency : 0.830 0.830 (1 shifl/daj <br />Net correction : 0.830 0.830 <br /> <br />