Laserfiche WebLink
PROJECT IDENTIFICATION <br />Agency or orgai <br />Task#: 02a <br />Date : 04/20/2006 <br />User: SSS <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />tization name : DMG <br />State :Colorado PermiUjob # : M-2005-071 <br />County:De/ta Abbreviation :none <br />Site :Benson Bros Red Shale Pit Filename :M071-02a <br />Permit or other job action :New 112c permit application <br />Task description :Haul subsoil from stockpiles to locations along mine benches <br />........_.._.... _ ~_._...._. __. __. ..._ ........,..._._ . , . _ .. -- ..... ._._.... ..-_P_... _ y _ _ <br />HOURLY EQUIPMENT COST Shift basis : 1 er da <br />Equipment Description <br />Tmck/loader team -Truck :Generic 10-12 cy, 6x4 <br />-Loader :CAT 950G (2002) <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-W ater truck :Water Tanker. 3.500 Gai. <br />Cost Breakdown : Tmck/Load <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data flename: huck2 loader NA NA NA misctruk <br />Utilization-machine : 100 89 NA NA NA 20 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour: $16.84 $18.57 NA NA NA $10.95 <br />Operating cost/hour : $25.86 $24.89 NA NA NA $4.12 <br />Ripper op. cosdhour : NA NA NA NA NA NA <br />Operator cosUhour : $21.75 $32.53 NA NA NA $21.16 <br />Unit subtotals : $64.45 $76.00 NA NA NA $36.23 <br />Number of units : 2 1 0 0 0 1 <br />Group subtotals : Work : $204.90 Support : $0.00 Maintenance : $36.23 <br />Total work team cosUhour : $241.13 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,226 LCY factor : NA volume : 3,226 LCY <br />Source of quantity take-off :Assume 3 acres covered with 8 inches of overburden <br />Source of estimated swell factor : NA <br />Matedal purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Caoaclty <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,550 pounds/LCY Stmck volume : 10.00 LCY <br />Descr.: Earth -Dry packed Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity : 13.88 LCY Adjusted volume`: 12.00 LCY <br />Final truck volume based on number of loader passes : 8.25 LCY <br />'truck volume adlustatl to not exceetl rated payload or heapetl volume <br />Loading Tool Capacity : ob Condition Corrections : Site altitude (ft.) : 6,340 <br />Rated capacity (nom. heaped) : 3.750 LCY Truck Loader Source <br />Descr.:Other- rock/dirt mixtures (100-120%) Altitude adj.: 1.000 1.000 (Cat HB <br />Bucket fll factor : 1.100 Job efficiency : 0.830 0.830 (1 shifUda <br />Adjusted bucket capacity : 4.125 LCY Net correction : 0.830 0.830 <br /> <br />sheet 1 of 2 <br />