Laserfiche WebLink
sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br /> TRUCK/LOADER TEAM WORK <br />t. __ _ __ <br />PROJECT IDENTIFICATION <br />Agency or organization name :DMG <br />Task # : 09a State :Colorado Permitlob # : M-2005-071 <br />Date : 04/20/2006 County :Delta Abbreviation :none <br />User : SSS Site :Benson Bros Red Shale Pit Filename : M071-09a <br />Permit or other job action :New 112c permit application <br />Task description :Haul topsoil from stockpiles to locations around processing area <br />i _ . _ _._._.__....__ r <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />-Loader <br />Support equipment -Load area <br />roa2 <br />Road maintenance -Motor grader : NA <br />-Water truck :Water Tanker, 3, 500 Gal. <br />Cost Breakdown : TmcWLoad <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA misctruk <br />Utilization-machine : 100 89 NA NA NA 20 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosUhour: $16.84 $18.57 NA NA NA $10.95 <br />Operating cosUhour: $25.86 $24.89 NA NA NA $4.12 <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cosUhour: $21.75 $32.53 NA NA NA $21.16 <br />Unit subtotals : $64.45 $76.00 NA NA NA $36.23 <br />Number of units ~ 2 1 0 0 0 1 <br />Group subtotals : Work : $204.90 Support : $0.00 Maintenance : $36.23 <br />Total work team cosUhour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 3.226 LCY factor: NA volume <br />$241.13 <br />3,226 LCY <br />Source of quantity takeoff :Assume 3 acres covered with 8 inches of overburden <br />Source of estimated swell factor : NA <br />Matedal purchase cost : $0.00 /LCY Total cost <br />Truck Caoaciri <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume <br />Descr.: Earth -Dry packed Heaped volume <br />Rated payload : 35,400 pounds Average volume <br />Payload capacity : 13.88 LCY Adjusted volume`: <br />Final truck volume based on number of loader passes <br />'truck volume atllusteG to not exceetl ratetl payloatl or heapetl volume <br />Loading Tool Caoaeiri : ob Condillon Corrections <br />Rated capacity (nom. heaped) : 3.750 LCY Truck <br />Descr.:Other-rock/dirt mixtures (100-120%) Altitude adj.: 1.000 <br />Bucket fill factor : 1.100 Job efficiency : 0.830 <br />Adjusted bucket capacity : 4.125 LCY Net correction : 0.830 <br /> <br />$0 <br />10.00 LCY <br />12.00 LCY <br />11.00 LCY <br />12.00 LCY <br />8.25 LCY <br />Site altitude (ft.) : 6,340 <br />Loader Source <br />1.000 (Cat HB <br />0.830 (1 shiWda. <br />0.830 <br />