Laserfiche WebLink
iC~~ <br />SENEC~4 <br />~~~ ~,m~~r ~~rE1VE0 Seneca Coal <br />~•- 0 Q 2006 <br />D,v`pEC { a dt~~ aly n, <br />y1an~0 <br />November 27, 2006 <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Quarterly Sedimentation Pond Inspections - Yoast Mine (Permit C- <br />94-082) <br />Dear Mr. Boulay: <br />Enclosed are the fourth quarter 2006 inspection reports for Ponds 010, <br />011, O11A, 012, 013 and 014 at the Yoast Mine. <br />If you have any questions, please call me at 970-276-5209. <br />Sincerely, <br />G^J\ <br />Dennis Jones <br />Hydrologist I <br />Enclosure(s) <br />Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />