Laserfiche WebLink
Uale: _ _ 1'2/24/01 <br />Ponrl: _ 1 _ /~Jc <br />EMERGENCY SPILLWAY <br />1). Does it appear that the emergency spillway has discharged wafer since Ilse last inspecfion^ <br />Yes No v' <br />2). Is erosion occurring at any section of the emeryency spillway? <br />Yes No (./ <br />Describe extent: <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Elevation of Water Surface: <br />Elevation to top of Sedimen <br />OTHER OBSERVATIONS <br />Nu r/ <br />a+.. <br />~ Y <br />MSHA Qualified Impoundm nt Inspector <br />Date <br />.. w~ <br />y.T ~' .. <br />Processional Engineer irec my Inspeotio ~-, <br />i ,~~,~' <br />Date <br />Page 2 of 2 <br />