My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28734
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:52 PM
Creation date
11/20/2007 9:47:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Hydrology
Doc Date
9/26/1985
Doc Name
FINAL PERMIT COLO WASTEWATER DISCHARGE PERMIT SYSTEM CO-0033553 BLUE RIBBON COAL CO BLUE RIBBON MINE
From
CDOH
To
BLUE RIBBON COAL CO
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 8 of 19 <br />G. GL'NERAL REQUIREMENTS <br />1. Representative Sampling; <br />Samples and measurements talon for the purpose of monitoring shall be <br />representative of the monitored activity. <br />2. Analytical and Sampling Methods for Monitoring <br />Analytical and sampling methods utilized by the discharger shall <br />conform to Colorado Regulations for Effluent Limitations (10.1.5), and <br />to regulations published pursuant to Section 304 (h) of the Clean Water <br />Ac[. <br />The analytical method selected for a paramenter shall be the one that <br />can measure the lowest detected limit for that paramenter unless [he <br />state standard is within the testing range of another approved method. <br />3. Records <br />The permittee shall establish and maintain records. Those records <br />shall include the following: <br />a) Tlie date, type, ex::ct place, and time o: sampling or measurements; <br />b) The individual(s) who performed [he sampling or measurements; <br />c) The date(s) the analyses were performed; <br />d) The individual(s) who performed the analyses; <br />e) The analytical techniques or methods used; and <br />f) The results of such analyses. <br />The permittee shall retain for a minimum of three (3) years records of <br />all monitoring information, including all original strip chart <br />recordings for continuous monitoring instrumentation, all calibration <br />and maintenance records, copies of all reports required by this permit <br />and records of all data Wised to complete the application for this <br />permit. This period of retention shall be extended during the course <br />of any unresolved litigation regarding the discharge of pollutants by <br />[lie permittee or when requested by [he Division or Regional <br />Administrator o1 LPA. <br />Crnlc: I - ..~ Da Cc: 1. - ~'~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.