My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28718
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:51 PM
Creation date
11/20/2007 9:46:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Hydrology
Doc Date
1/11/1999
Doc Name
SENECA II-W MINE C-82-057 QTRLY STOCKPOND INSPECTIONS
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBRIODIC INSPBCTION FORN <br />Stockpoada or Sumps <br />INSPECTOR'S NAME: Rov Raro <br />FACILITY CONFIGURATION: stoc pond <br />SITE NAME: T-2d <br />MINE NAME: s neca 77-W <br />MINE I.D. NO.: C-B2-057 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />DATE: 12/16/98 <br />DATE LAST INSPECTION: 09 ~,'~0 /98 <br />LOCATION: sW1rNE_~ sec 9 TSN RBBW <br />LOCATION: B mi S of Hayden CO <br />OWNER'S REP.: Brad Brown, C-en Mqr <br />Angle of elope: 3.9:1 upstream, 4.6:1 downstream <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment elopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />Cracks or scarps on crest: <br />Cracks or scarps on elope: <br />Sloughing or bulging on elope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />8. *Eroeion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: A~nroximately <br />11. Increase Decrease in water level: No change <br />12. Cracks, bulging, or erosion on upstream face: <br />13 <br />14 <br />Spillway erosion: _ <br />*Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yee ~ N/A <br />Yes ~ N/A <br />Yee ~ N/A <br />Ye9 No N/A <br />Yee ® N/A <br />Yee `COY N/A <br />Yes ~ N/A <br />Yes ® N/A <br />Yee ~ N/A <br />Yes ~ N/A <br />Yee No N/A <br />Yee ~ N/A <br />5"7 feet <br />feet <br />Yee ~o N/A <br />Yee ® N/A <br />Yes ~ N/A <br />Yee N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />Total = B.5:1 N/A <br />etc.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.