Laserfiche WebLink
.„ <br />. .~ <br /> <br />Harold E. Dolan <br />Engineering Coordinator <br />U.S. Department of Labor <br />Mine Safety and Health Administration <br />July 14, 1983, Page 2 <br />The structural integrity of the dam by inspection has remained unchanged <br />and all appurtenant structures, including trash racks, decant, valves, and <br />discharge C.M.P. ate in place and operating as designed. Considering that the <br />dam will primarily retain surface runoff in the spring and not the large <br />quantities of pit water for which it was originally designed, Coyote Dam should <br />remain sound and stable throughout the projected life. <br />Sincerely, <br />c 1 `~. <br />Larry Johns <br />Sr. EnginF~er <br />(Qualifie~!1 Impoundment Inspector) <br />Trapper Mane <br />LJ/je <br />