My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28691
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28691
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:50 PM
Creation date
11/20/2007 9:44:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Hydrology
Doc Date
8/5/1994
Doc Name
PUBLIC NOTICE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPARTMENT OF HEALTI•ater Quality Control Division <br />Rationale -Page 12, Permit No. CO-0029947 <br />• <br />~uure ri-r - muuuunar neuurrements <br />atmne[er:.:... .. . <br />::.::.: <br />::.Measuiitmeitt:Freatiencv <br />Samck 74oe <br />Flow, MGD Weekly Instantaneous <br />7SS, mg/[ Weekly Grab <br />Oil and Grease, mg/[ Weekly Visual' <br />Oil and Grease, mg/l Monthly Grab <br />pN, s. u. Weekly Grab <br />7DS, mg/P 3 X Monthly Grab <br />Whole Efjiuem Taricity, Acute Quarterly Grab <br />Ammonia, Total, mg/P as N Monthly Grab <br />COD, mg/P Momhly Grab <br />Boron, mg/[ Monthly Grab <br />Sulfate, mg/P Monthly Grab <br />Fluoride, mglP Monthly Grab <br />Nitrate, mg/P Monthly Grab <br />Phenok, mg/[ Monthly Grab <br />Arsenic ~I), mg/P Quarterly Grab <br />Copper (PD), mg/[ Quarterly Grab <br />Lead PDI, mR/[ Quarterly Grab <br />PD -Potentially Dissolved <br />T -Total <br />' If a visible sheen is noted, a grab sample shall be collected and analyzed for oil and grease. The results are to be reported <br />on the DMR under parameter 00556. <br />C. Reporting <br />1. Ducharee Monitoring Reoort: Occidental Oil Shale Inc. must submit a Discharge Monlloring Report (DMR) on <br />a monthly basis to the Division. This report should contain the required summarization of the test results for <br />parameters shown in Tables VI-4 and Part I.B.1 of the permit. See the permit, Para I.B.1 and I.B.2for details <br />on such submission. <br />2. Additional Reportin¢: No additional monitoring is being incorporated tuo the renewal permit. <br />3. Soecial Reoorts -Special repots are required in the evem of a spill, bypass, or other noncompliance. Please refer <br />to Part 11, Section A.1, A.2, A.3, and A.6 of the permit for reporting requirements. <br />D. Additional Terms and Conditions <br />1. ~natorv Requirements -Signatory requirements for reports and submittals are discussed in Part /, Section D.I <br />of the permit. <br />2. Materials Containment Plan: According to the perndttee, the last Materials Containment Plan x+os submitted in <br />October 1986. An update to the plan rs required to be filed within 90 days of the permit effective date, detailing <br />all changes which have occurred since the original submittal. For sped requirements, refer to Part LE of the <br />permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.