Laserfiche WebLink
PART t <br />Page No. 8d <br />Permtt Na. CO-0000132 <br />• B. MOMTORIPlG REQIJIItEMENTS <br />I. Frequency and Sample Tvoe (continued) <br />If the permittee, using the approved analytical methods, monitors any parameter more frequently than required by this <br />permit, then the results of such monitoring shall be included in the calculation and reporting of [he values required in the <br />Discharge ~9onitonng Report Form (DMRs) or other Forms as required by the Division. Such increased frequency shall <br />also be indicated. <br />Outfall 007 Monitoring Exemption: The permittee is exempted from monitoring at outfall 007 durng periods when <br />access would be hazardous to personnel. For each reporting period that an exemption is requested, the permittee shall <br />provide written documentation of the conditions and specitic periods during which access was restricted. The Division will <br />review this documentation and determine if an exemption is lttsttfied. If safe access is possible during a portion of a <br />reporting period, the permittee shall inspect the discharge at the specified frequencies. <br />(d) Oil and Grease Monitorine <br />For every outfall with oil and grease monitoring, in the event an oil sheen or floating oil is observed, a grab sample <br />shall be collected, analyzed, and reported on the appropriate DMR. In addition, corrective action shall be taken <br />immediately to mitigate the discharge of oil and grease. A description of the corrective action taken should be <br />included with the DMR. <br />?. Six Time Analysis - Ou[fall 015 <br />The permittee shall collect six ¢rab samples at outfall 015 on a monthly basis, beginning on commencement of the new <br />discharge. The parameters to be monitored are: total recoverable arsenic, total recoverable cadmium, dissolved iron, and <br />dissolved manganese. <br />As soon as the results of all six analyses are available to the permittee, the results shall be tabulated in a letter and <br />submitted to the Division. The due dale for submission of this compliance item is September 1. 2000. If sampling is <br />delayed for reasons beyond the permittee's control, such as a period of no discharge within the designated sampling period, <br />the permi« ee shall notify the Division in writing, indicating the reason for the delay and the adjLLSted projected submission <br />date. <br />See Part LC. fur Definitions. ~'',"'~~ '! ',~ MAY 01 7000 <br />-~„ <br />Amendment No. S Issued ~ Effecnve <br />