Laserfiche WebLink
I <br /> <br />IV. RESULTS AND CONCLUSIONS <br />The purpose of this report was [o provide the supplemental information <br />t requested by the reviewing agencies with regards to Che special exception <br />permit. The scope of the analysis has been narrowed by the selection of <br />1 Alternative II as presented in the Bishop Associates report. The results <br />of the analysis are presented in the figures and the calculation Appendix <br />' to this report. The responses to each question raised by the reviewing <br />agencies are presented in Section III of this report. <br />' Sufficient detail has been provided in this report and in the other <br />exhibits to the special exception application to assure sufficient drainage <br />runoff and sediment control during and after the operation of the proposed <br />quarry. The information presented herein is a guideline by which the quarry <br />operators can achieve the desired drainage results. The final details of <br />the drainage system will be determined during the actual operation. <br /> <br />1 <br />t <br />1 <br /> <br />1 <br /> <br /> <br />1 <br />-5- <br />1 <br />