Laserfiche WebLink
Minor Revision No. 1 - Fencing Permit Area • <br />Zhis im~olved the constnx-tion of a permit or reclamation fence on or <br />close to the new permit boundary. <br />Minor Revision No. 2 - Diversion Ditch/Redesign #004 Perri <br />During construction of Pond #004, it was determined that excavation of <br />the pond to desicg~ depth was impossible. RYre pond was redesigned with a <br />portion of the u*Y7~~~*'bed upstream drainage diverted arauri the pond. <br />Minor Revision No. 3 - Change in Facilities <br />'This involved the construction of a new office aryl modification of the <br />existing shop buildirgs. <br />Minor Revision No. 4 - Scraper Road <br />In orrier to remove part of the topsoil in the Wolf Creek area, scrapers <br />were required to traverse down a drainage. This is the same drainage as <br />noted in the Wolf Creek Permit Revision. <br />Minor Revision No. 5 - Wolf Creek Augerira • <br />4his was an extension of auger mining tD the Wolf CreeiC area. Previous <br />technical revisions (Technical Revision #3) addressed the main aspects <br />of auger mining at the Seneca Mine. <br />Minor Revision No. 6 - Topsoil Variance <br />4his revision requested a variance frmn topsoil salvage in two steep <br />areas at the Seneca Mine (Wolf Creek and Wadge a*~~~). <br />Minor Revision No. 7 - Haul Road Reconstruction <br />Zhis revision addressed haul road reconstruction in order for auger opal <br />to be loaded out of Pit "B". <br />Minor Revision No. S - Wolf Creek Drilling Plan <br />In order to define the opal reserves aryl depths in the lower Wolf Creels <br />area, a drilling and reclamation plan was submitted order this revision. <br />• <br />-12- Revised 07/23/8;' <br />