Laserfiche WebLink
INTERNATION~ • IIIIIIIIIIIIIIIIIII <br />URANIUM (USA) sss <br />CORPORATION <br />Independence Plaza, Suite 950 1050 Seventeenth Street • Denver, CO 80265 • 303 628 7798 (main) • 303 389 4125 (fix) <br />June 29, 1999 Received <br />VIA FACSIMILE AND FEDERAL EXPRESS JUN 3 ~ i999 <br />Mr. Bob Oswald DE~y~/E DNis~~"9o Frerd <br />Division of Minerals and Geology PUBLIC F ~FF~CF ron c/Mtner~s a ceo~ <br />Department of Natural Resources E, ~P <br />Durango Field Office S ~C,~ ~g7`D C <br />484 Turner Drive, Bldg. F, Suite 101 perMr ~$ <br />Durango, CO 81301 74PP~cq ,~ {~ <br />ei. <br />Re: Van 4 Shaft, File No. M-97-032, Technical Review Letter Responses <br />Dear Mr. Oswald: <br />The following responses reFerence each of the questions and concerns pertaining to the <br />Van 4 Shaft Permit Application received front the Colorado Division of Minerals and <br />Geology (CDMG), Department of Natural Resources, describe in the November I8, <br />1999, Technical Adequacy Review letter to International Uranium (USA) Corporation <br />(TUBA). Responses parallel the sequence of paragraphs/questions posted in the <br />November 18, 1998 correspondence and are as follows: <br />The group of claims referenced in the application and posted on Exhibit G are <br />operated by International Uranium (USA) Corporation (TUBA) ("TUBA") and <br />owned and controlled by lUC Colorado Plateau, LLC ("TUC Colorado Plateau"), <br />an affiliate of IUSA, and IUSA. Land within 200 feet of the permit area, which is <br />not held by mineral lode claim is public domain and is managed by the Bureau of <br />Land Management. Proof of Notice to the BLM was previously submitted as an <br />addition to Exhibit J. Also attached hereto is a copy of the filings maintaining the <br />claims for the September 1, 1998 to September I, 1999, to be added to Exhibit G. <br />2. Road access to the ventilation shaft located on the Rodman No. 4 Claim is an <br />established "Way" used by the general public for fuel wood gathering, grazing <br />allotment access and public utility company inspection of the electric power <br />transmission line and therefore as such is excluded from the mine site permitted <br />acreage. <br />3. The exact location of the future ventilation shaft on the Curley 3 or 4 Claim is yet <br />to be established, although access to the fitture ventilation shaft will be via the <br />existing public utility company electric power transmission line inspection road <br />and right-of--way. Anew road is not expected to be required. <br />