Laserfiche WebLink
<br />-3- <br />Exhioit d - Mining Plan for Metal Plines <br />1. If the operation is to be a metals mine, describe the operation with <br />regards to access, deposition of waste material, control of runoff. <br />Snow adits, dumps, etc. on Exhibit L-1 map. <br />2 <br />if milling is to occur, describe the nature of the milling process and <br />facilities. show any structures on the Exhibit C-1 map. <br />3 <br />If a tailinys pond is to oe part of the milling process, descriue its <br />size, inethud of construction, and Show its location on the Exhioit Cl <br />map. consideration should be given to designing a system which will <br />adequately contain the slurry, prevent seepage, erosion, or washout of <br />the pond. <br />