Laserfiche WebLink
WELL 2A-2V PROGNOSIS <br />Convert shut in producer from Boies formation to back up water supply <br />well from A-Groove aquifer. <br />Run in well with 2-7/8 inch work string and set 4-1/2 inch CIBP (cast iron bridge plug) <br />@ 1920 feet from surface inside 4-1/2 inch liner. <br />Pressure test casing to 300 PSI. <br />Run in well and put 420 feet of 15.8 # class G cement on top of CIBP. <br />Wait on cement. <br />Run in well and tag cement @ 1500 feet. <br />Rig up perforators and run in well and shoot 6 shots per foot into 7 inch casing from 1400 <br />to 1420 feet, into the A- Groove aquifer. <br />Run in well with electric submersible equipment on 4-1/2 inch tubing to produce water <br />from A- Groove aquifer. <br />