Laserfiche WebLink
<br /> <br /> <br />++N EREAS as part of the application for sucn permit <br />principal nas agreed with the state to complete b specified <br />plan ("tne plan") for reclamation as required oy law of the <br />lands di sturoed Dy reason of sucn mining operations. ine <br /> plan may be amended from time to time w~tn.tne approval of <br />. <br /> i <br />> Ch8 st eta, acting through. the Depaf tmenC of Natural 0.e50urte5 <br /> and. as appropriate, the yineD Land Reclamation Division • <br /> ("the division") or the Mined Land Reclamation 9oartl ("tne <br /> <br />~~ ~ DoarD"). <br /> (Tne pnr ase "board or divisions' in CniS Dond medp5 <br />~~ ~ ~ chat organ of state government .nice nas the autnoricy to <br /> act in ine circumstance referred to. and recognizes cnac <br />' theyineo Land Reclamation Act (34-32-141 CL_52A•1 and the <br />~~ :olorado Surface Coal Mining ReclamaC(on Act (3'.-33-141 <br /> S4t7.1 confer distinctive and sometimes different responsioil- <br /> hies upon the Doard and the Division.) ' <br /> VDi1 T4ERE°DRE, Che COnDitiOn2 Of CniS dbligdti0n dra <br /> such t,nat if the above bonDeD principal shall in concocting <br /> such mining and reclamation opera<ions faithf oily perform <br /> the fequirement5 Of Lhe plan a5 3mende0 from time to [i.nB <br />.. and comply ritn the conDi ti ons of the permit and "icn all <br /> applicaola laws antl regulations of the state ant if cr.a <br /> board or the division snail make a finDing chat tna lands <br /> <br /> 133 <br />