Laserfiche WebLink
<br />Banks and Gesso, LLC <br />This mix will be applied to any topsoil berm that will remain for longer than one <br />year. <br />The two permanent seed mixes were developed based on the reclamation <br />location for which they will be applied: near the water's edge of the reservoir <br />ponds and the surrounding pit edges over and near to the slurry wall, the <br />reconstructed ditch alignment, the site of the scale and scale house/office and <br />any surficial disturbance near to the oil wells and tanks. This seed mix will also <br />be used for seeding of the visual and noise barrier berm in the northwest corner <br />of the site. This berm will remain for the life of the operation until final <br />reclamation. <br />Recommendations given in the letter will be followed as described with regard to <br />the method of seeding, seeding dates, fertilization, and follow-up maintenance for <br />weed control by mowing. Mowing will be performed for at least two years after <br />seeding to help establish regenerating stands of grasses and to control weed <br />infestation. Seeded areas will not be mulched with a straw or hay mulch, as no <br />large areas will be exposed to wind or rain erosion. <br />Ft. Lupton Sand antl Gravel Mine.CDMG.712 Pennd zZ 99024.WD <br />L.G. Everist, Inc. December, 1999 <br />