My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67004
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:42 PM
Creation date
11/20/2007 9:39:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
Permit File
Doc Date
12/27/1999
Doc Name
Original Application - First Half
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Banks and Gesso, LLC <br />7. Stripping of topsoil and construction of de-watering trenches will occur <br />prior to mining Phases 5 and 6 with discharge of groundwater, due to <br />dry mining, occurring at the southeast corner of the plant site. After all <br />aggregates are mined in these Phases, removal of the processing <br />plant and hatching operations will occur as the final phase of mining <br />disturbance. <br />8. Final reclamation of the site with topsoiling and reseeding of all <br />remaining disturbed areas will occur. This includes all the pit edges, <br />shoreline slopes (above and slightly below the pre-determined <br />reservoir water level), any disturbance around the oil wells and tanks, <br />and the production water well. Backfilling of the pit slopes to an <br />undulating shoreline with 3:1 and 2:1 grades leading to the pit floor will <br />have been completed. Filling of the connected reservoirs with decreed <br />storage water will occur. <br />The estimated duration for mining of each phase is summarized below: <br />Phase 1 13.8 acres years 1-3 <br />Phase 2 13.7 acres years 3-6 <br />Phase 3 13.5 acres years 6-8 <br />Phase 4 13.4 acres years 8-9.5 <br />Phase 5 10.9 acres years 9.5-11 <br />Phase 6 12.8 acres years 11-13 <br />Assuming one year will be required for final reclamation of the plant site and haul <br />road after mining is completed, the estimated total duration for the project is 13 <br />to17 years based on sales due to market conditions. <br />Ft. Lupton Sand and Gravel Mine.CDMG.112 Permit ), 6 99024.WD <br />L.G. Everist, Inc. December, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.