<br />Banks and Gesso, LLC <br />7. Stripping of topsoil and construction of de-watering trenches will occur <br />prior to mining Phases 5 and 6 with discharge of groundwater, due to <br />dry mining, occurring at the southeast corner of the plant site. After all <br />aggregates are mined in these Phases, removal of the processing <br />plant and hatching operations will occur as the final phase of mining <br />disturbance. <br />8. Final reclamation of the site with topsoiling and reseeding of all <br />remaining disturbed areas will occur. This includes all the pit edges, <br />shoreline slopes (above and slightly below the pre-determined <br />reservoir water level), any disturbance around the oil wells and tanks, <br />and the production water well. Backfilling of the pit slopes to an <br />undulating shoreline with 3:1 and 2:1 grades leading to the pit floor will <br />have been completed. Filling of the connected reservoirs with decreed <br />storage water will occur. <br />The estimated duration for mining of each phase is summarized below: <br />Phase 1 13.8 acres years 1-3 <br />Phase 2 13.7 acres years 3-6 <br />Phase 3 13.5 acres years 6-8 <br />Phase 4 13.4 acres years 8-9.5 <br />Phase 5 10.9 acres years 9.5-11 <br />Phase 6 12.8 acres years 11-13 <br />Assuming one year will be required for final reclamation of the plant site and haul <br />road after mining is completed, the estimated total duration for the project is 13 <br />to17 years based on sales due to market conditions. <br />Ft. Lupton Sand and Gravel Mine.CDMG.112 Permit ), 6 99024.WD <br />L.G. Everist, Inc. December, 1999 <br />