My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67004
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:42 PM
Creation date
11/20/2007 9:39:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
Permit File
Doc Date
12/27/1999
Doc Name
Original Application - First Half
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Banks and Gesso, llC <br />the Lupton Bottom Ditch near the close of the phase will occur. Activities will <br />include construction of de-watering trenches, the sump pit and discharge pump <br />location, topsoil removal and storage, and mining. <br />The second phase, consisting of about 13.7 acres, will be mined proceeding to <br />the east of Phase 1 after the Lupton Bottom Ditch is reconstructed. Anew de- <br />watering trench will be advanced east on the south side of the phase and north, <br />up the east side of the phase. Discharge will occur from the southeast corner of <br />this phase to the South Platte River. Mining will proceed in this phase, as <br />previously described, until completion. <br />The third phase of mining, consisting of approximately 13.5 acres, will progress <br />north from Phase 1 and be completed by mining to the east. As in Phase 1, the <br />removal and reconstruction of the Lupton Bottom Ditch will occur near the end of <br />the phase, as shown on Exhibit C. The sequence of stripping, construction of de- <br />watering trenches (utilizing the sump and de-watering location located in the <br />southeast corner of the plant area) and topsoil stockpiling will be replicated for <br />Phase 3. The de-watering system in the excavated east portion of Phase 2 will <br />be maintained to remove any standing water collected there. <br />Phase 4 will be mined to the east and north, after removal of the farmhouse and <br />out-buildings, utilizing the same system as described previously and de-watering <br />the phase by connecting to the trenches and discharge point of Phase 2. Mining <br />Ft. Lupton Sand and Gravel MIne.CDMG.112 Pertnd ~p 99024.WD <br />L.G. EverisL Inc. December, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.