Laserfiche WebLink
<br />Banks and Gesso, llC <br />the Lupton Bottom Ditch near the close of the phase will occur. Activities will <br />include construction of de-watering trenches, the sump pit and discharge pump <br />location, topsoil removal and storage, and mining. <br />The second phase, consisting of about 13.7 acres, will be mined proceeding to <br />the east of Phase 1 after the Lupton Bottom Ditch is reconstructed. Anew de- <br />watering trench will be advanced east on the south side of the phase and north, <br />up the east side of the phase. Discharge will occur from the southeast corner of <br />this phase to the South Platte River. Mining will proceed in this phase, as <br />previously described, until completion. <br />The third phase of mining, consisting of approximately 13.5 acres, will progress <br />north from Phase 1 and be completed by mining to the east. As in Phase 1, the <br />removal and reconstruction of the Lupton Bottom Ditch will occur near the end of <br />the phase, as shown on Exhibit C. The sequence of stripping, construction of de- <br />watering trenches (utilizing the sump and de-watering location located in the <br />southeast corner of the plant area) and topsoil stockpiling will be replicated for <br />Phase 3. The de-watering system in the excavated east portion of Phase 2 will <br />be maintained to remove any standing water collected there. <br />Phase 4 will be mined to the east and north, after removal of the farmhouse and <br />out-buildings, utilizing the same system as described previously and de-watering <br />the phase by connecting to the trenches and discharge point of Phase 2. Mining <br />Ft. Lupton Sand and Gravel MIne.CDMG.112 Pertnd ~p 99024.WD <br />L.G. EverisL Inc. December, 1999 <br />