Laserfiche WebLink
• <br />SEDIMENTATION STRUCTURE 004 <br />PRINCIPAL SPILLWAY REDESIGN <br />INTRODUCTION <br />Sedimentation Pond 004 was originally constructed in ] 982 and re-evaluated in 1986 resulting in a <br />modification to the principal spillway. It was determined that a 6 inch diameter pipe was the best <br />practical size in order to increase detention time and still have enough storage above the peak stage <br />for pit pumpage. Therefore a 36-inch corrugated metal pipe was installed with a 6-inch opening at <br />the inlet <br />Pond 004 was inspected during Apri12005 following snow and ice melt and it was determined that <br />there was enough deterioration to the discharge barrel of the princpal spillway to warrant <br />replacement of this pipe. It should be noted that the ptinapal spillway is still functioning as designed <br />at this time. <br />ABANDONMENT/REPLACEMENT PLAN <br />The abandonment plan consists of digging up the existing pipe and replacing it with corrugated <br />plastic pipe installed at the appropriate elevation. The new principal spillway will installed at the <br />appropriate elevation in the trench dug across the width of the embattlement to remove the current <br />metal pipe. The corrugated "plastic" pipe will be placed in the trench and the trench material <br />compacted back azound it. The elevation and location aze shown on Exhibit 7-27, Pond 004 <br />• Prinapal Spillway Redesign. Once the new spillway is in place a screened cage will be attached to the <br />inlet to elitrtinate potential plugging by debris. <br />Attached aze the SEDCAD demonstrations used to size the "neu~' prindpal spillway. The watershed <br />map used to calculate runoff and to determine the hydrologic input criteria is attached as Exhibit 7- <br />22,Pond 004 & 008 Watershed Boundary. The design is graphically displayed on Exhibit 7-21, Pond <br />004 Ptindpal Spillway Redesign. $ should be noted that this redesign does not affect or include the <br />existin¢ emereencv soillwav. This snillwav is adequate to safely Hass the 25 yr/24 hr orecioitation <br />event <br />L <br />