Laserfiche WebLink
Subtotal (C): <br />u <br />• <br />• <br />RECLAMATION COST SUMMARY cront'd <br />D. EARTFiIORK - FILL COMPACTION <br />Task No.~ Task Description <br />~ compaction cost included in backfilling cast <br />E. EARTHr10RK RIPPING <br />Task No.~ Task Description <br />1 <br />sheet 2 of 4 <br />LOSL (S) <br />Subtotal (D): <br />Rip shale from pit floor to construct pond liner <br />~ Lost (S) <br />529.509 <br />Subtotal (E): f19.509 <br />• <br />F. EARTHNORK ROAD RECLAMATION <br />Task No,( Task Description <br />~ Cost (f} <br />Subtotal (F) <br />G. EMTHNORK - FINISH GRADING <br />Task No.~ Task Description <br />~ Cost (f) <br />