Laserfiche WebLink
~ ._,.. <br />January 2, 1988 <br />William P. Bala z, P.E. <br />Kaiser Coal Corporation <br />102 S. Tejon St., Suite 800 <br />P. 0. Boz 2679 <br />Colorado Springs, .Colo. 80901-2679 <br />Dear Mr. Balaz: <br />~s per my letter to and anscrer from CMLRi) and my <br />telephone conversation with you last sJednesday Dec. 30th, I <br />am writing this letter. <br />The bridge or culvert that is now in place, across <br />Hubbard Creek, on the Blue Ribbon property is in the same <br />location that we have always maintained a bridge over the <br />years. <br />There has always been a bridge and road used as a <br />livestock crossing to reach our fee and BEM grazing acreage. <br />which lays on both sides of the Hub'~ard Creek canyon. <br />If possible we would like to preserve this crossing <br />for our future mining plans and livestock crossing. <br />Kr.y attention or help from you tY:at might aid in pre- <br />serving the bridge or culvert from the present reclamation <br />work would be greatly 3ppreciatad: <br />Sincerely, <br />--~:~•~ <br />G. ',I. ',lien <br />.,, . CMLAJ <br />Ji~r. Stover <br />RECE~u~~ <br />JAN 4 1988 <br />0 <br />MINED LANu <br />RECLAaAA71ON 171VI$1ON <br />