Laserfiche WebLink
PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />INSPECTOR'S NAME: Dennis Jones DATE: 06/19/01 <br />NPDES I.D. NO.: CO-0000221 D.P. 005 <br />FACILITY CONFIGURATION: Cross-Valley Pond DATE LAST INSPECTION: 03/29/01 <br />SITE NAME : Pond #005 LOCATION: NW'/, SW'/,, Sec. 10, TSN, RBBW <br />MINE NAME : Seneca II-W Mine (Seneca Coal Co) LOCATION: 8 mi. S of Hayden, CO <br />MINE I.D. NO.: CMLRD Permit No. C-82-057 OWNER'S REP.: Greg g Kitchen, Gen Mgr <br />Circle or write in appropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil: Yes No N/A <br />2. Lift thickness: 12 in. N/A <br />3. Compaction according to approved plan: Yes No N/A <br />4. Burning (specify extent and location): Yes No N/A <br />5. Angle of slope: 3.5:1 upstream, 2.5:1 downstream Total = 6:1 N/A <br />6. *Seepage (specify location, color, and approximate volume) <br /> From underdrain pipes: Yes No N/A <br /> At isolated points on embankment slopes: Yes o N/A <br /> At natural hillside: Yes No N/A <br /> Over widespread areas: Yes No N/A <br /> From downstream foundation area: Yes No N/A <br /> "Boils" beneath stream or ponded water: Yes No N/A <br />7. Cracks or scarps on crest: Yes No N/A <br />8. Cracks or scarps on slope: Yes No N/A <br />9. Sloughing or bulging on slope: Yes No N/A <br />10. *Major erosion problems: Yes No N/A <br />11. Surface movements in valley bottom or on hillside: Yes No N/A <br />12. *Erosion of toe: Yes No N/A <br />13. *Water impounded againsC toe: Yes No N/A <br />19. Existing embankment freeboard: (normal = 7.4') 8.2 feet <br />15. Increase x. Decrease in water level: 0.8 feet <br />16. Cracks, bulging, or erosion on upstream face: Yes No N/A <br />17. Visible sumps or sinkholes in slurry surface: Yes No N/A <br />18. *Clogging <br /> Spillway channels and pipes: Yes No N/A <br /> Decant system: Yes No N/A <br /> Diversion ditches: Yes No N/A <br />19. *Cracking or crushing of pipes <br /> Spillway pipes: Yes ®o N/A <br /> Decant system: Yes ® N/A <br />20. Trash racks clear and in place: es No N/A <br />*Major adverse changes in these items could cause instability and should be reported to the <br />Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions noted in <br />these items should normally be described (extent, location, volume, etc.) in the space on the <br />