My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66959
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:40 PM
Creation date
11/20/2007 9:37:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
5/15/2001
Doc Name
CDPHE CONSTRUCTION PERMIT (Air), Meteorology & Particulate Study
Section_Exhibit Name
EXHIBIT 08 PERMIT 95-MF-1040
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 <br />Construction Permit <br />Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />COLOWYO COAL COMPANY, L.P. <br />Permit No. 95-MF-1040 <br />• Final Approval -Modification-4 <br />ATTACHMENT A [CONTINUATION - 2 ] <br />DETAILS OF EQUIPMENT / ACTTVITIES COVERED UNDER TH1S FACILITY-WIDE PERMIT <br />• <br /> <br />AIRS ID DESCRIPTION <br />MAKE, MODEL, S/N, DESIGN RATING, CAPACITY <br />DIMENSIONS, CONSUMPTION, THROUGHPUT REMARKS <br />SPECIFIC PROVISIONS <br />027 Handling of Auxiliary (also known as Stoker) Coal: Subject to NSPS, Y. <br /> Hauling of auxiliary coal to rail loadout or off-site by 30-ton trucks Fugitive Dust Control Plan. <br /> on paved roads. Throughput: 72,727 vehicle-[Hiles travelled per <br /> year. <br /> Unloading of auxiliary coal onto railcar siding surge pile. <br /> Throughput: 300,000 tons per yeaz. <br /> Loading auxiliary coal into railcars using front-end loaders. <br /> Throughput: 300,000 tons per year. <br />028 Handling and Processing of Rock Cor Haul Road Maintenance: <br /> Hauling of rock to rock crusher by 240-ton hocks. Throughput: <br /> 10,084 vehicle-miles travelled. Fugitive Dust Control Plan. <br /> Transfer of rock into rock crusher. Throughput: 1,200,000 tons per W a[er /Chemical Treatment of <br /> year. Unpaved Haul Roads. <br /> Rock Crushing: One (I) Make, Model and S/N: not available, Make, Model, & S/N: obliterated <br /> design rate not available. Throughput: 1,200,000 tons per year. due to age of equipment and, <br /> wear and teaz. <br /> Rock Screening: One (1) Make, Model and S/N: not available, <br /> design rate not available. Throughput: 1,200,000 tons per year. <br /> Storage Pile: Rock storage. 2 acres total area of active stockpiles. <br />END OF ATTACHMENT A <br /> <br />Note: The throughputs given in this attachment aze not limits. They indicate the various activities at the overall permit <br />limits specified under Condition No. 6. <br />081/00071999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.