Laserfiche WebLink
• Geologic Unit: Madge Overburden <br />Year (Block): 2008 (NOV28.in) <br />K: .003 <br />S: 10.5 <br />SY: .20 <br />1: .120 ft/ft <br />Start Dete: 2008 <br />Pit Width: 130 ft. <br />No. Pits: 5 (73 days) <br />Total Area: 62.13 acres <br />uet Area: 46.58 acres <br />Avg. Sat. Thickness: 59.2 ft. <br />Confined Need Above Aquifer: 0 ft. <br />Confined Aquifer Thickness: 0 fi. <br />Total Head: 59.2 ft. <br />• Comments: I (q7 grad) <br />4.3 x .7 + 6.5 x .3 = 4.96 <br />Specify unconfined <br />Total length per year: 20,818 ft. <br />Total length per pit: 4,164 ft. <br />Total length in wafer per year: 15,608 ft. <br />Total length per pit in water per year: 3,122 ft. <br />Total area per pit: 541,320 ft2 <br />Total wet Brea per pit: 405,860 ft2 <br />~~ <br />Revised 03/01/95 <br />