My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66920
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:39 PM
Creation date
11/20/2007 9:36:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999073
IBM Index Class Name
Permit File
Doc Date
11/10/1999
Doc Name
Cost Estimate
From
DMG
To
SUMMIT ENGINEERING CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />__________________________________________________________I____________ <br />________________________________________________________________________ <br />Subtotal (K ): <br />L. DRILL HOLE/MONITORING LIE LL SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________________________________________________________________________ <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />Demolition <br />3 ~ Seeding <br />Fencing <br />4 ~ Mob/Demob <br />Cost (E) <br />E2,196 <br />E472 <br />Subtotal (M): E2,670 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): E7, 159 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (E) <br />1. ~ Pubtic Liability Insurance.... 1.550% of dir. ~ E111 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ E111 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ E716 <br />4. Job Superintendent.. <br />____________________________________________ <br />_________________ <br />___________ <br /> Subtotal (A ): E938 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (dir ect plus 0 8 P): 56,097 <br /> <br />B. DMG PROJECT ADMINISTRATION E%PENSES ____________ <br />Item No.~ Item Description ~ Cost (E) <br />~ <br />1. ~ Minerals Program Admin. Fee at <br />_______________________ <br />___ ~ <br />5.00% of cn[r.~ <br />E405 <br />_ <br />_________________ <br />NE7 INDIRECT COST PERCENTAGE: 18.76% <br />__________ ________________ <br />Subtotal (6): ____________ <br />E408 <br />____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): E1,343 <br />70TAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E8,802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.