My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66919
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:38 PM
Creation date
11/20/2007 9:36:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Permit File
Doc Date
1/21/1999
Doc Name
Reclamation Costs
Section_Exhibit Name
Exhibit L
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Project Structure Dimensions (width, <br />length, height in feet) <br />Structure Composition <br />Solution Receiving Tank 100' diameter x 40' high Steel <br />Crystallizer Wash Tank 25' diameter Steel <br />3 Storage Silos (at <br />Railroad Loading Dock) 50' diameter x 108' high <br />50' diameter x 108' high <br />50' diameter x 108' high Steel <br />Other Structures <br />Substation 120 x 120 <br />Rail and Truck Loadout <br />Facilities 16.6 acres Steel structures <br />Note: All new buildings constructed at the Piceance Site will be constructed with <br />concrete pile foundations that average 80 feet deep and 12 inches in diameter. <br />In addition to the building and structures identified above, the Parachute Site will <br />include: <br />• Piping = 40,000 feet <br />• Roads = 2.6 miles <br />• Underground utility lines = 1,800 feet <br />• Railroad spur = 4 miles. <br />Disturbance areas for new permanent project features at the Parachute Site that will not <br />be reclaimed until the end of the project are indicated in Table L-7. Reclamation of <br />existing disturbed areas would increase these values somewhat. <br />Table L-7 Other Parachute Site Permanent Features <br />Project Feature Estimated Total <br /> Disturbance Area <br /> (acres) <br />Parachute Site Processing Plant 4.7 <br />and Substation <br />Railroad Loadout Facilities 16.6 <br />Storage and Evaporation Ponds 52.8 <br />L-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.